All site survey templates
Each template is a ready-made job form with its calculations. Try one with no account, or start your 14-day free trial with the one that fits your work.
Painting
Residential painting
Room by room: walls (a whole room on one line), ceilings, trim, doors and cabinets, with gallons and labor hours.
You get: Net Paintable Area Area to cover, primer and paint coats Paint
Commercial painting
Commercial areas with deductions, primer and finish coats, gallons to order and trim costs per linear foot.
Watch the film: an office floor (3 min 32 s)All demos
You get: Net Paintable Area Area to cover, primer and finish coats Primer Gallons Needed
Exterior painting and staining survey
Elevation by elevation: walls and gables, trim, soffits, doors and shutters, decks and fences to stain, gallons per product.
You get: Area to paint Paint Trim area
Wallpaper: installation survey
Wall by wall: the drops, the drop length rounded up to the pattern repeat, the drops per roll and the rolls per wallpaper.
You get: Wall area Rolls
Windows and window film
Windows and doors: replacement measure
The windows and doors of a house, room by room: replacement type, three readings with the smallest kept, squareness, depth, hinges and glass.
You get: Area
Windows: commercial building survey
A window measurement template: one section per facade, one row per opening, the glazed area and perimeter per facade and for the building.
You get: Opening area Caulk perimeter
Commercial window film
Film for multi-story buildings, floor by floor: glass area, film product and linear elements.
You get: Glass Surface Area Total Area Panes over 40 sq ft
Window film
Film for a house or a small building: windows, skylights and glass doors, film area per type, safety film anchoring.
You get: Total Area Panes over 40 sq ft Anchored length
Window screen survey
Screens to rescreen or make: the size from how each was measured, mesh, roll, spline and frame.
Sealed glass unit survey
Failed sealed units to replace: the size to order from your measure and your supplier's correction, makeup, glass, area and weight.
You get: Glass area
Basement egress window survey
Basement egress windows: the cut in the foundation, concrete to remove, clear opening and sill, window well, stone and dig.
Caulking
Residential caulking survey
A house before a recaulk: windows and doors, other joints, bathroom and kitchen, cartridges from your product's coverage.
You get: Length to caulk Sides and top length Bottom length
Facade joint survey (ft)
Lengths in feet, joints in inches, volume in gallons and 10.1 oz cartridges, facade by facade.
You get: Sealant volume Cartridges
Facade joint survey (m)
Lengths in meters, joints in millimeters, volume in liters and 300 ml cartridges, facade by facade.
You get: Sealant volume Cartridges
Roofing
Roofing: inspection & measurement
Face by face: area, pitch, material, condition, waste and squares, with photos, and the attic ventilation.
You get: Area Area with waste Squares
Roofing: measurement and materials
Real sloped area from the pitch, squares, shingles, underlayment, ridge cap and drip edge.
You get: Real area Area with waste Squares
Metal roofing survey
Metal roofs plane by plane: panels from the coverage width, length to order, screws, strapping, snow guards, trims and flashings.
You get: Area Panels Panel length to order
Low-slope roof survey
Flat roofs section by section: slope, system in place, test cuts, drains, upstands, rolls and boards.
You get: Area Test cuts Upstand run
Roof repair survey
Shingle and flashing repairs: damaged areas, bundles to match, step pieces from the exposure, chimney width; skylights to replace and their light shafts.
You get: Area to redo Step flashing pieces Shaft walls
Flooring
Flooring: room measurement
Room by room: area, floor type, waste and area to order, and the stairs flight by flight.
You get: Area Area to order Boxes
Hardwood floor refinishing
Existing hardwood to sand, room by room: wear layer, existing finish, defects, moisture, boards to replace, and finish products in gallons.
You get: Floor area Stair area to finish
Flooring and painting: whole house
Floor by floor: flooring with waste, boxes, walls, baseboards and paint.
You get: Floor area Floor area with waste Flooring boxes
Tile installation survey
Floors, walls, showers and backsplashes: tile and boxes, thinset by trowel, grout by joint, membrane.
You get: Area to tile Tile to buy Boxes
Heated floor: survey
An electric heated floor, room by room: heated area from the maker's clearances, membrane, cables and area covered.
You get: Floor area Heated area Rolls or sheets
HVAC
HVAC: load & duct survey
Room areas and rough loads (BTU, tonnage), design airflow, duct runs and equipment, with costs.
You get: Room Area Cooling estimate Heating estimate
Ductless heat pump: installation survey
A ductless heat pump, head by head: capacity, line sets and height against the manual, extra refrigerant and the outdoor unit.
You get: Line set to order
HVAC maintenance visit
The maintenance visit, unit by unit: temperature rise, pressures, subcooling and superheat, filters, CO; ducts and dryer vents.
You get: Inside surface to clean
Air exchanger (HRV/ERV): installation survey
An air exchanger before the work: the exhaust the code asks by bedrooms, the flows and the balance, the duct runs and the exterior hoods.
Furnace, heat pump and AC replacement: survey
Before a central system is replaced: the equipment as on its nameplates, the static pressure, the line sets, the venting and the licensed trades.
Construction
Construction: site measurements
Foundation, floors, walls and roof: concrete to order, net areas, roof squares and shingle bundles, lengths.
You get: Volume Concrete to order Granular base under the slab
Construction: materials & costs
The same measurements with a unit price on each line and crew hours: material costs, labor costs and a grand total.
You get: Volume Concrete to order Granular base under the slab
Foundation drain survey
Foundation drains wall by wall: excavation, pipe, stone, membrane; inside, the drain under the slab, the sump pit and its pump's cycle, the cracks to repair.
You get: Excavation Pipe length Clear stone
Concrete flatwork: driveways, patios and walks
A concrete driveway, patio or walk: concrete to order, base, control joints counted from your spacing, isolation joints and slope.
You get: Area Concrete volume Concrete to order
Basement finishing: survey
Rooms with their ceiling heights and clear heights under beams, walls by type, doors and egress windows, connections as recorded, moisture and radon.
You get: Floor area Perimeter Openings area
Landscaping
Hardscaping: patios & walkways
Patios, walkways and walls: material with waste, base stone in tons, polymeric sand, geotextile and excavation.
You get: Total area Material to order Base volume
Landscaping: planting
Beds, hedges and amendments: number of plants, mulch and soil volumes.
You get: Planting area Total number of plants Mulch needed
Lawn installation: sod and seed
A new lawn, zone by zone: sod or seed, sod to order, rolls, pallets, seed, topsoil and fertilizer.
You get: Lawn area Sod to order Seed to buy
Artificial turf installation: survey
Artificial turf, area by area: dig, base per material, roll strips and turf to order, seams, nails and staples, infill and bags.
You get: Net area Soil to dig Base
Bed edging and decorative stone: survey
Bed edging and decorative stone, bed by bed: pieces and stakes, stone volume, fabric, bags or bulk tons.
You get: Pieces Bed area Stone volume
Landscape lighting: survey
Low-voltage landscape lighting: watts and VA per run, fixtures per product, voltage drop and voltage at the last fixture, transformers.
You get: Total watts Total VA
Lawn care
Lawns and edges: areas, condition, frequency and estimated mowing time.
You get: Total area
Tree & shrub pruning
Trees and hedges: dimensions, pruning type, brush volume and labor time.
You get: Area to trim
Irrigation systems
Irrigation zones, pipes and tanks: flows, water use and trench volume.
You get: Irrigated area Zone flow Water per watering
Landscaping: general maintenance
Grounds upkeep: areas, tasks, frequency, time and waste volume.
You get: Maintenance area
Yard drainage survey
French drains and dry wells: trench, stone, geotextile, water to hold, pit volume and footprint, hours to empty.
You get: Water to hold
Tree removal and stump grinding survey
Tree removal and stump grinding, tree by tree: DBH, condition, permit, inches of DBH and stump, volume ground and debris loads.
You get: DBH to fell Stump diameter to grind
Fencing
Fence survey
Runs by style, posts, sections, rails and pickets, gates, concrete bags, the old fence and a chain link take-off.
You get: Posts Sections Rails
Fence repair: survey
Repairs: stretches, each post with its condition and the fix chosen, boards, rails and chain link to replace, sagging gates.
Decks
Deck survey
Surfaces and decking, joists and fasteners, hidden clips, beams and concrete, guards, stairs with stringers and risers, fascia.
You get: Deck area Board rows Decking length
Pergola: survey
A pergola: posts from their spacing, beam boards, rafters and purlins with their lengths, footing concrete and bags.
You get: Posts Beam boards Rafters
Aluminum and glass railings: survey
Railing runs with their sections and posts, the mounting and the structure seen, stair sections on their slope, glass panels, gates.
You get: Sections Posts Length along the slope
Gutters
Gutter survey
Runs by size, hangers, end caps, corners and outlets, downspouts with elbows and straps, old gutters, gutter guards and heat cables.
You get: Hangers Roof area per outlet Downspout length
Gutter cleaning service
A cleaning contract: each run with its height, guard and debris, the water test, the hours of a visit and of the year.
Snow removal
Snow removal: site survey
Areas by use, stairs and ramps, stakes, de-icing and liquids per application and per season at your rates, and room to pile snow.
You get: Area Material per application Pre-wet liquid per application
Residential snow removal survey
Driveway and cars, walkways, sidewalk, steps and balconies, stakes, snow piles and contract terms, with the hours per visit and for the season.
You get: Area Material per application Stakes
Cleaning and maintenance
Commercial cleaning: pre-bid site walkthrough
Space by space: area by floor type, fixtures, visits per week and periodic work, for hours per week and per year.
You get: Cleanable area Liners per week Liners per year
Floor care: strip, finish and carpet
Net area by service, finish and stripper to buy, grout cleaning and sealing, labor hours and a carpet pre-inspection with photos.
You get: Net area Finish Tiled area
Window cleaning survey
Windows and panes on each side of the building, inside and outside, with the access, the height and the cleaning time.
You get: Panes Outside panes Inside panes
Pressure washing and exterior cleaning
Driveways, patios, walls and fences: area by material, method, sealer to buy and wash water.
You get: Flat surface area Sealer Wall area
Post-construction cleaning: site survey
The end of a build, space by space: area and hours by phase (rough, final, touch-up), glass, fixtures and exterior.
You get: Area to clean Inside panes Outside panes
Move-out and rental turnover cleaning: survey
Move-out, move-in or short-term rental, room by room: areas, hours at your rates, extra tasks, conditions found on arrival and linens per turnover.
You get: Floor area Per month Linens to stock
Insulation
Insulation survey
Attic, walls, foundation and rim joists: existing and target R-value, bags or units per product, vents, hazards and air sealing.
You get: Attic area Value to add Bags
Spray foam insulation survey
Spray polyurethane foam, area by area: thickness, board feet, passes, sets, R-value and thermal barrier.
You get: Area to spray Board feet
Crawl space encapsulation: survey
The ground, walls and piers the membrane covers, the laps, rolls and tape, vents and equipment as found, moisture, radon and conditions.
You get: Ground area Wall membrane Pier membrane
Siding
Siding survey
Four elevations with walls and gables, openings, trim and soffits: squares and pieces per product, housewrap, furring and old siding hazards.
You get: Gross wall area Siding area Squares
Stucco repair: survey
Stucco walls by system and area, cracks, delaminated or blistered areas, moisture readings, flashings and sealant.
You get: Wall area Damaged area
Drywall
Drywall survey
Walls and ceilings room by room, sheets, trim, compound, tape and screws, GA-214 finish levels, repairs and textured ceilings.
You get: Board area Sheets Trim pieces
Suspended ceiling survey
Suspended ceilings room by room: tees, wall angle, hanger wires, 2 x 4 or 2 x 2 panels and the border panels.
You get: Ceiling area Wall angle run Wall angle pieces
Sound insulation: survey
Sound insulation work: walls and ceilings by location, treatment, sheets, damping, resilient channel, sealant and openings.
You get: Area Sheets Damping tubes
Epoxy floors
Epoxy floor survey
Floor areas, joints and cracks, moisture tests, cove base, doors and drains; each coat's coverage, liquid, kits, flakes and quartz.
You get: Floor area Filler Filler packages
Polished concrete survey
Ground and polished concrete: exposure class, appearance level, steps, hours, densifier, guard, DOI, gloss and haze readings.
You get: Floor to polish
Concrete resurfacing: survey
Surfaces to resurface, condition and finish, coats and bags from the coverage per bag; repairs and their bags, cracks and joints to keep.
You get: Area to resurface Resurfacer bags Patch volume
Masonry
Masonry repair and tuckpointing survey
Elevations, repointing by the square foot and by the linear foot of joint, mortar bags, bricks, cracks, lintels and sills, chimneys and parging.
You get: Joint length Mortar Mortar bags
Concrete block wall: survey
Wall by wall: net area, blocks from the size and joint with waste, mortar bags, grouted cores and grout bags, per product.
You get: Net wall area Blocks Mortar bags
Concrete steps repair: survey
Concrete steps: flights with their riser and run differences, damage by step, patch volume and bags, cracks and sealant tubes.
You get: Patch volume Bags Sealant tubes
Window coverings
Window coverings: window measure
Windows room by room: three widths and heights, mount, depth, diagonals, control, the size for the order and curtains.
You get: Covered area
Drapery workroom: fabric calculation
For the drapery workroom: finished width, fullness, widths, the cut to the repeat and the yards of each fabric and lining.
You get: Widths Fabric needed
Commercial shades: schedule by floor
For commercial jobs: shades by floor and zone, pocket or fascia, fabric and openness, control groups, cubicle curtains.
You get: Fabric area
Awnings and exterior shades: survey
Outdoors: awnings and canopies, width, projection, mounting and front bar height, wall and obstructions, then exterior shades.
You get: Awning area Shade area
Sealcoating and striping
Sealcoating: site survey
Areas by use and condition, cracks, potholes and patches, oil spots; sealer, water, sand and pails for each coat.
You get: Area Sealant volume Sealant weight
Parking lot striping: survey
Stalls by type and angle, lines by kind and color, stencils, curbs and wheel stops, paint per color.
You get: Line length Line paint Stencil paint
Asphalt driveway paving: survey
A new asphalt driveway: excavation, base in cubic yards and tons, base and surface courses in tons per mix, slope.
You get: Paved area Soil to dig Base
Gravel driveway: survey
A gravel driveway: excavation, geotextile, base and surface gravel in cubic yards and tons, crown, slope and entrance culverts.
You get: Gravel area Soil to dig Geotextile rolls
Garage doors
Garage door survey
Opening by opening: door size, clearances, track, springs, opener and weatherstrip, then the sections and hardware to replace.
You get: Door area
Commercial overhead doors: survey
Door openings with their lift and clearances, operators and their controls, loading docks, existing doors' conditions.
You get: Door area
Kitchen and bath
Bathroom remodel: survey
The room and its openings, tile and membrane by surface, fixtures and their clearances, plumbing and electrical as recorded, existing conditions.
You get: Floor area Perimeter Wall area
Countertops: survey
Each countertop piece and its area, the overhangs and their supports, the backsplash, cutouts sized from the makers' templates, connections as recorded.
You get: Countertop area Backsplash area
Glass shower enclosures: survey
The opening in three widths and two heights, plumb and level, the curb, each glass panel with its area and weight, other glass near the shower.
You get: Glass area
Your trade isn't listed? The AI assistant builds your form.
Start your 14-day free trialNo credit card. Cancel anytime.