Deck survey
Surfaces and decking, joists and fasteners, hidden clips, beams and concrete, guards, stairs with stringers and risers, fascia.
No credit card. Cancel anytime.
Feet and inches or metric: your choice. One switch on the sheet converts every measurement.


What you measure
The template's tables and their columns, as the app shows them. Calculated columns fill in as you type.
Deck surfaces
- Surface
- AttachmentChoices: Ledger to the house Freestanding
- Height above grade
- Length along the house
- Projection
- Deck area calculated
- DeckingChoices: Pressure-treated wood Cedar Composite PVC Other
- Board width
- Gap between boards
- Board rows calculated
- Waste
- Decking length calculated
- Board length bought
- Boards calculated
- Joist sizeChoices: 2x6 2x8 2x10 2x12 Other
- Joist spacing
- Joists calculated
- Joist length calculated
- Hangers per joist
- Joist hangers calculated
- Fasteners per board and joist
- Decking fasteners calculated
- Area per fastener box
- Fastener boxes calculated
- Ledger length
- Rim joist calculated
- Blocking row spacing
- Blocking pieces calculated
- Ledger fastener spacing
- Ledger fasteners calculated
- Flashing piece length
- Ledger flashing pieces calculated
- Notes (access, slope, trees, existing structure)
Beams, posts and footings
- Beam line
- Beam length
- Beam sizeChoices: 2x6 2x8 2x10 2x12 Other
- Plies
- Beam lumber calculated
- Post spacing
- Posts calculated
- Post sizeChoices: 4x4 6x6 Other
- Post height
- Footing diameter
- Footing depth
- Concrete per footing calculated
- Concrete per bag
- Concrete bags calculated
- Notes
Guards
- Guard run
- GuardChoices: Wood Aluminum Glass Composite Cable Other
- Guard length
- Guard height
- Guard post spacing
- Guard posts calculated
- Baluster width
- Gap between balusters
- Balusters calculated
- Notes
Stairs
- Stair
- Total rise
- Highest riser allowed
- Tread run
- Stair width
- Risers calculated
- Actual riser calculated
- Treads calculated
- Stringer spacing
- Stringers calculated
- HandrailChoices: Both sides One side None
- Total run calculated
- Stringer length calculated
- Boards per tread
- Tread boards calculated
- Boards per riser
- Riser boards calculated
- Screws per board and stringer
- Stair screws calculated
- Notes
Old deck to remove
- Old deckChoices: Wood Composite Other
- Area to remove
- Haul awayChoices: Yes No
- Notes
Fascia
- Side
- Fascia length
- Fascia board length
- Fascia boards calculated
- Screw row spacing
- Screws per row
- Fascia screws calculated
- Notes
Boards to replace
- Where
- DeckingChoices: Pressure-treated wood Cedar Composite PVC Other
- Board size
- Boards to replace (count)
- Board length
- Length of boards to replace calculated
- FasteningChoices: Face screws Hidden clips Nails To check
- Joists underChoices: Sound as seen Soft or rotted spots Not seen
- MatchChoices: Matches Close match Will not match To check
- CauseChoices: Rot Split, cupped or warped Impact or burn Loose Other
- Notes
See these tables calculate with your own measurements, no account.
Try this templateMore templates: Decks
Pergola: survey
A pergola: posts from their spacing, beam boards, rafters and purlins with their lengths, footing concrete and bags.
You get: Posts Beam boards Rafters
Aluminum and glass railings: survey
Railing runs with their sections and posts, the mounting and the structure seen, stair sections on their slope, glass panels, gates.
You get: Sections Posts Length along the slope
About this template
Walk a deck job: surfaces with decking boards from your gap and waste, joists, hangers and fasteners from your spacing, beams, posts and concrete for the footings, guards and balusters, stairs, and the old deck to remove.
Guide and sources
Read the guide and sources
Walk the deck with the client. Record each surface on its own row: its attachment (ledger or freestanding), height, length along the house and projection. Boards are counted from their width, your gap, your waste and the length you buy; joists, hangers and fasteners from your spacing. Joist and beam sizes are picked from the span tables cited in the help (IRC R507, or AWC DCA 6 as a separate reference).
For each beam line, record its length, the post spacing and the footings: concrete is worked out from the diameter, the depth and the bag's yield. Footings go at least 12 in down, and below the frost line when the deck is attached to a frost-protected house (IRC R507.3). Before digging, call 811.
Guards and stairs have their own tables: guards 36 in high above a 30 in drop, openings under 4 in, risers of 7 3/4 in at most and treads of 10 in at least (IRC R312, R311.7). Check the permit with your city.
For the stairs, the sheet gives the total run and the stringer length along the slope, then the tread and riser boards from the boards you set per tread and per riser, and the screws at each stringer. Each maker sets its own stringer spacing for composite treads (Fiberon 12 in, Deckorators 9 in, TimberTech 9 or 10 in by collection) and its own fastening; the help cites them. On the deck, type the area one box of hidden fasteners covers to get the boxes, and in the fascia table the board length and the screw rows to get the boards and the screws.
Board replacement has a section of its own, a row per group of boards to replace: where, the decking and the board size, the boards and their length (the length adds up by material), how the old boards are fastened, the joists under them as seen once the boards are off (recorded, never judged), whether new boards can match (asked and seen, never promised) and the cause. The hints quote Trex on taking out a screwed or clipped board and Wood Preservation Canada on the screws and the gap.
Framing takeoff on each deck surface: the rim joist along the joist ends (two for a freestanding deck), blocking pieces where your span table calls for rows, the ledger fasteners from the spacing in the table that applies (IRC R507.9.1.3 and DCA 6 in the US; in Canada the NBC prescribes none, the hints quote the Ottawa and Whitehorse bulletins and APCHQ's fiche) and the ledger flashing pieces at the length you buy. Nothing is pre-filled: you type the spacings and lengths from your code table and your products.
Sources
- IRC 2021, R312.1 and R311.7 Code
- Trex 2026 guide Manufacturer data
- TimberTech composite guide Manufacturer data
- IRC 2021, R507 Code
- MoistureShield, deck clips Manufacturer data
- AWC DCA 6 Trade association
- IRC 2021, R703.4 Code
- JLC, ledger flashing Manufacturer data
- Quikrete 1004 data sheet Manufacturer data
- Fiberon, decking install guide Manufacturer data
- Deckorators, stair treads Manufacturer data
- Trex, replacing a deck board Manufacturer data
- 811 Before You Dig Trade association
- NBC 2020, 9.8 Code
- Wood Preservation Canada, building tips Trade association
- NBC 2020, Part 9 Code
- City of Ottawa, ledger advisory Government
- Whitehorse, bulletin 2026-004 Government
- APCHQ, fiche S4-03 Trade association
- Ville de Montréal, permis de terrasse Government
- RBQ, travaux d'excavation Government
- Ville de Québec, fiche 15 Government
Your trade isn't listed? The AI assistant builds your form.
No credit card. Cancel anytime.