Free vapor barrier calculator: rolls and square feet
Get the vapor barrier square footage, laps included, and the rolls to buy in seconds, free and without an account. One row per slab or room: its length, width and how many identical ones. Add the seam lap, the turn-up at the walls and your roll size: the calculation gives the area to cover, the poly to order with the laps and the rolls. In imperial or metric.
The whole job, not only this calculation
For general contractors and their crews, the templates do what this page cannot: the whole job on one sheet, every measurement on its own line, saved in the client's project with a PDF or Excel report.
- Construction: site measurements: Foundation, floors, walls and roof: concrete to order, net areas, roof squares and shingle bundles, lengths.
- Construction: materials & costs: The same measurements with a unit price on each line and crew hours: material costs, labor costs and a grand total.
- Flooring: room measurement: Room by room: area, floor type, waste and area to order, and the stairs flight by flight.
- MesuPro for general contractors: every template of the trade, the demo and the report
Vapor barrier: what the codes and makers say (reference)
The minimums our templates cite, as read. The product and your local code have the last word.
| What the sources say | |
|---|---|
| Under a concrete slab (US) | IRC 2021: a vapor retarder of at least 10 mil (ASTM E1745 Class A), joints lapped at least 6 in (152 mm); check the edition your state enforces |
| Under a slab on the ground (Canada) | Polyethylene at least 0.15 mm (6 mil) thick, joints lapped at least 100 mm, where dampproofing goes under the floor; the floor is part of the air barrier against soil gas, with a radon rough-in |
| Under a floating floor over concrete | 6 mil (0.15 mm) virgin polyethylene, seams overlapped 8 in (200 mm) or more |
Sources: IRC 2021, R506; NBC 2020, 9.13.2.6; NBC 2020, 9.13.4; Pergo, laminate installation
How it is calculated
Area = length x width x identical areas, added up over every row (the construction templates' vapor barrier under the slab). Turn-ups = 2 x (length + width) x turn-up height, for each area. Area to cover = area + turn-ups. The poly is laid in whole strips of the roll width, each one the area's length with its turn-ups, lapped along their edges: strips = (width to cover - lap) / (roll width - lap), rounded up, laid the way that takes less poly; a strip longer than the roll is pieced, one lap per joint. Poly to order = strips x roll width x strip length x (1 + waste). Rolls = poly to order / (roll width x roll length), rounded up to the roll: an estimate, the real layout decides the cuts. The lap starts at the code's 6 in (152 mm); the turn-up, roll size and waste are yours.
FAQ
How much vapor barrier do I need for a crawl space?
The crawl space floor, plus the turn-up on the walls, plus the laps. For a 30 x 40 ft crawl space with a 12 in turn-up in this example: 1,200 sq ft of floor and 140 sq ft of turn-up, 1,340 sq ft to cover. With a 12 ft wide roll, 6 in laps and no waste, that is 3 strips of 42 ft, 1,512 sq ft of poly, or 2 rolls of 12 x 100 ft. For an unvented crawl space, IRC 2021 R408.3 asks for a Class I vapor retarder, joints lapped 6 in and sealed, and edges at least 6 in up the stem wall. Your local code has the last word.
What thickness of vapor barrier goes under a slab?
IRC 2021: at least 10 mil (ASTM E1745 Class A), joints lapped at least 6 in. In Canada, NBC 2020: polyethylene at least 0.15 mm (6 mil), joints lapped at least 100 mm. The area and the rolls are counted the same way: only the product changes.
Is a moisture vapor barrier counted differently?
No: under a slab or on a crawl space floor, the poly that keeps ground moisture out is measured by area plus laps. For a 24 x 36 ft slab with a 12 ft wide roll and 6 in laps, that is 864 sq ft to cover and 4 strips of 24 ft, 1,152 sq ft of poly, 1 roll of 12 x 100 ft. Only the product changes: at least 10 mil under a slab for IRC 2021, 6 mil (0.15 mm) for NBC 2020.
What about the vapor barrier cost?
The calculator gives quantities, not prices: the area to cover, the poly with the laps and the rolls to buy. Multiply the rolls by your supplier's price and add your labor: the 24 x 36 ft slab above takes 1 roll of 12 x 100 ft.
The slab, the footings and the concrete too?
The calculator counts the poly. The construction templates below take every slab and footing, the concrete and the base under it, with the vapor barrier, and put the totals by section in a PDF or Excel report. You can try them without an account.
The whole job in MesuPro
For general contractors and their crews: every employee measures with the same form, the math is done as they type, and the office finds the sheet and its PDF or Excel report. 14-day free trial, no credit card.
Construction: site measurements
Foundation, floors, walls and roof: concrete to order, net areas, roof squares and shingle bundles, lengths.
You get: Volume Concrete to order Granular base under the slab
Construction: materials & costs
The same measurements with a unit price on each line and crew hours: material costs, labor costs and a grand total.
You get: Volume Concrete to order Granular base under the slab
Flooring: room measurement
Room by room: area, floor type, waste and area to order, and the stairs flight by flight.
You get: Area Area to order Boxes
Your trade isn't listed? The AI assistant builds your form.
Start your 14-day free trialNo credit card. Cancel anytime.
Did this page help you?