Siding survey

Four elevations with walls and gables, openings, trim and soffits: squares and pieces per product, housewrap, furring and old siding hazards.

No credit card. Cancel anytime.

Feet and inches or metric: your choice. One switch on the sheet converts every measurement.

Siding survey: a filled-in survey in MesuPro
Siding survey: the same sheet on a phone
A survey made with this template, in the app.

What you measure

The template's tables and their columns, as the app shows them. Calculated columns fill in as you type.

Walls

  • Wall
  • Length
  • Height
  • Gable height
  • Gross wall area calculated
  • Openings to deduct
  • Siding area calculated
  • ProfileChoices: Vinyl lap Insulated vinyl Fiber-cement lap Engineered wood lap Wood lap Steel or aluminum Vertical, board and batten Shingles or shakes Panels Other
  • Product
  • Waste
  • Squares calculated
  • Exposure (shingles and shakes)
  • Pieces per square
  • Pieces or cartons calculated
  • Membrane roll coverage
  • Membrane rolls calculated
  • Furring spacing
  • Furring length calculated
  • Crew hours
  • Notes

Openings

  • Opening
  • TypeChoices: Window Door Garage door Other
  • Width
  • Height
  • Count
  • Opening area calculated
  • Trim around calculated
  • Head flashing calculated
  • Notes

Trim and accessories

  • Where
  • ItemChoices: Starter strip J-channel Outside corner Inside corner Undersill or finish trim Drip cap or head flashing Frieze or band board Fascia Window or door trim Other
  • Length
  • Product
  • Piece length
  • Pieces calculated
  • Notes

Soffits

  • Location
  • Length
  • Depth
  • Soffit area calculated
  • VentedChoices: Vented Solid Mixed
  • Product
  • Coverage per panel or carton
  • Panels or cartons calculated
  • Net free area, % of the panel
  • Soffit open area calculated
  • Crew hours
  • Notes

Attic ventilation

  • Attic or roof space
  • Insulated ceiling area
  • Vent ratio, 1 per
  • Vent area required calculated
  • Share at the bottom
  • Intake at the soffits calculated
  • Notes

Stone veneer

  • Wall
  • Length
  • Height
  • Openings to deduct
  • Outside corners, running length
  • Flat area per corner length
  • Flat stone area calculated
  • Stone product
  • Waste
  • Flats coverage per box
  • Boxes of flats calculated
  • Corner length per box
  • Boxes of corners calculated
  • Lath sheet coverage
  • Lath sheets calculated
  • Mortar coverage per bag
  • Mortar bags calculated
  • Water-resistive barrier, two layers calculated
  • Weep screed calculated
  • Notes

Siding repairs

  • Wall
  • PieceChoices: Panel or board Outside corner post Inside corner post J-channel Starter strip Soffit panel Other
  • ProfileChoices: Vinyl lap Insulated vinyl Fiber-cement lap Engineered wood lap Wood lap Steel or aluminum Vertical, board and batten Shingles or shakes Panels Other
  • Product and color
  • Pieces to replace
  • Piece length
  • Length to replace calculated
  • MatchChoices: Matches Close match Will not match To check
  • CauseChoices: Impact (hail, ball, mower) Wind Heat (grill, reflected sun) Moisture or rot Other
  • Notes

See these tables calculate with your own measurements, no account.

Try this template

More templates: Siding

Stucco repair: survey⁠

Stucco walls by system and area, cracks, delaminated or blistered areas, moisture readings, flashings and sealant.

You get: Wall area Damaged area

About this template

Measure each elevation's walls and gables, the openings and the trim, and get the squares and pieces per product from the makers' coverage charts, with the membrane, the rainscreen furring, the soffits and the hazards of old siding.

Guide and sources

Read the guide and sources

Elevations: walk around the house with the front behind you on the left side and the right side as you face the front. On each face, measure every wall's length and height, and the gable's height from the top of the wall to the peak: a gable-end wall is one row. The siding area is the gross area, minus the openings only if you deduct them: the VSI manual says windows and doors are usually not deducted.

Material: pick the profile and name the product, then type your waste and the pieces per square from the product's coverage chart, at the exposure (reveal) and length you install. Hardie and LP publish planks or pieces per square, waste not included; the VSI manual says to add 10% to all material estimates. A square is 100 sq ft (9.29 m²). Vinyl comes in cartons: type 1 ÷ the squares per carton. The pieces are exact on each row and rounded up once per product.

Water: the cladding is the first plane of protection; a sheathing membrane or water-resistive barrier behind it is the second (NBC 9.27.3.3: one layer, laps of 100 mm; IRC R703.2: laps of 2 in, 6 in at vertical joints). Flashing goes over openings (NBC 9.27.3.8, IRC R703.4) and sealant between the siding and window and door frames (NBC 9.27.4.1).

Rainscreen: in Canada, NBC 9.27.2.2 asks a capillary break, a drained and vented space at least 9.5 mm deep, where the moisture index of Appendix C is over 0.90 (under 3400 degree-days) or 1.00 (3400 or more). It depends on the place: Montréal (0.93 at 4200) and Québec (1.0) do not need it, Sainte-Foy (1.1) and Percé (1.2) do. The IRC asks none for lap siding: follow the maker's instructions. Type the furring spacing on the wall rows that get furring.

Quebec: the Construction Code, Chapter I (the NBC 2020 modified for Quebec) applies since 2025-04-17; work begun before 2027-10-17 may still follow the previous edition (a one-year extension of the transition, in effect since 2026-09-10). Its Quebec modifications to 9.27 could not be checked here: confirm the edition and any change with the RBQ.

Clearances: the NBC keeps moisture-sensitive cladding (untreated wood, plywood, OSB, hardboard) 200 mm above the ground and 50 mm above a roof (9.27.2.4); in the US, wood siding within 6 in of the ground must be durable or treated (IRC R317.1). The makers ask their own: Hardie 6 in (203 mm in Canada) to grade and 2 in (50 mm) to roofs and decks, LP 6 in (200 mm) and 1 in (50 mm).

Old siding: asbestos-cement shingles and old fiber-cement may contain asbestos, and painted siding may carry lead paint (Health Canada: likely before 1960, possible on exteriors until 1990; US EPA RRP rule for homes built before 1978). Do not cut, sand or break a suspect material: only a laboratory test tells.

Cedar shingles: type the exposure on each wall and the cartons or bundles per square at that exposure from the maker (Maibec red cedar: 50 sq ft a carton at 7 in, 3 % added) or the CSSB coverage table (a 4-bundle square of 16 in shingles: 140 sq ft at 7 in). The exposure hint gives the NBC's and the CSSB's maxima side by side. Fascia is a trim item. Soffits: type the vented panel's net free area as a share of the panel (sq in per sq ft divided by 1.44) and the sheet gives each soffit's open area. Attic ventilation, a row per attic: the insulated ceiling area and the code's ratio (NBC 9.19.1.2: 1/300, or 1/150; IRC R806.2: 1/150, or 1/300 under its exception) give the vent area required, and the share at the bottom the intake to provide at the soffits, to compare with the soffits' open area. Never a pass or fail.

Stone veneer (adhered manufactured stone) has a section of its own, a row per wall area: the length, the height, the openings and the outside corners' running length. The flat stone area is the wall less the openings and less what the corners cover (Ply Gem: half a square foot per running foot); with your waste and each product's coverage per box, the sheet gives the boxes of flats and of corners, rounded up once per product, the lath sheets and the mortar bags. The water-resistive barrier counts two layers (CMHA, Ply Gem) and the weep screed runs along the bottom, held 4 in above the earth and 2 in above paving (IRC R703.12, CMHA).

Repairs have a section of their own, a row per kind of piece to replace on a wall: panels or boards, corner posts, J-channel, starter strip, soffit panels, with the siding type, the product and color, the pieces and their length (the length to replace adds up by piece), whether new pieces can match the old ones (asked and seen, never promised) and the cause. The hint quotes the vinyl siding manual's steps to replace a panel and repair a corner post.

Sources

  • VSI installation manual Trade associationVinyl Siding Installation Manual, Polymeric Exterior Products Association (formerly the Vinyl Siding Institute), 2022 edition (the PDF's cover: Vinyl Siding Institute, copyright 2020). Checked Oct 7, 2026
  • IRC 2021, R703.11 CodeInternational Residential Code 2021, R703.11 Vinyl siding, International Code Council, 2021. Checked Oct 7, 2026
  • James Hardie, HardiePlank (US) Manufacturer dataHardiePlank Lap Siding installation instructions, HZ5, United States, James Hardie Building Products, HS11117, effective September 2019. Checked Oct 7, 2026
  • LP SmartSide, coverage chart Manufacturer dataLP SmartSide Coverage Chart, Louisiana-Pacific Corporation, LPZB0884, July 2021. Checked Oct 7, 2026
  • Maibec, red cedar shingle Manufacturer dataWestern red cedar shingle, technical data sheet, Maibec, E232365F.1, March 2026 (French). Checked Oct 15, 2026
  • CSSB, sidewall exposure and coverage Trade associationSidewall application guidelines, maximum sidewall exposure chart and sidewall coverage table, Cedar Shake and Shingle Bureau, pages 16 and 19 (posted 2020). Checked Oct 15, 2026
  • IRC 2021, R703.6 CodeInternational Residential Code 2021, R703.6 Wood shakes and shingles (as adopted in Colorado), International Code Council (read in a state adoption on UpCodes), 2021. Checked Oct 15, 2026
  • IRC 2021, R703.2 CodeInternational Residential Code 2021, R703.2 Water-resistive barrier, International Code Council, 2021. Checked Oct 7, 2026
  • IRC 2021, R703.4 CodeInternational Residential Code 2021, R703.4 Flashing, International Code Council, 2021. Checked Oct 7, 2026
  • LP SmartSide, lap siding Manufacturer dataLP SmartSide 38 and 76 Series Primed Lap Siding, application instructions, Louisiana-Pacific Corporation, LPZB0515, 2023-12-08. Checked Oct 7, 2026
  • IRC 2021, R317.1 CodeInternational Residential Code 2021, R317.1 Protection of wood, location required, International Code Council, 2021. Checked Oct 7, 2026
  • CertainTeed InvisiVent soffit Manufacturer dataTriple 3-1/3 in InvisiVent soffit, product page, CertainTeed, web page read 2026-10-15. Checked Oct 15, 2026
  • IRC 2021, R806.2 CodeInternational Residential Code 2021, R806.2 Minimum vent area (as adopted in Colorado), International Code Council (read in a state adoption on UpCodes), 2021. Checked Oct 15, 2026
  • Ply Gem Stone, installation guide Manufacturer dataPly Gem Stone installation guide (mortared stone veneer), Ply Gem Stone, 2017. Checked Oct 15, 2026
  • CMHA, adhered stone veneer guide Trade associationInstallation Guide and Detailing Options for Compliance with ASTM C1780 for Adhered Manufactured Stone Veneer, Concrete Masonry & Hardscapes Association (formerly NCMA and MVMA; copy hosted by Eldorado Stone), 5th edition, 6th printing, revised April 2024. Checked Oct 15, 2026
  • IRC 2021, R703.12 CodeInternational Residential Code 2021, R703.12 Adhered masonry veneer installation (as adopted in Colorado), International Code Council (read in a state adoption on UpCodes), 2021. Checked Oct 15, 2026
  • VSI manual, replacing a panel Trade associationVinyl Siding Installation Manual: replacing a damaged panel, repairing a damaged corner, Polymeric Exterior Products Association (formerly Vinyl Siding Institute), English 2022 edition and French 2020 edition, Other recommendations, PDF page 40. Checked Oct 19, 2026
  • EPA, asbestos GovernmentProtect Your Family from Exposures to Asbestos, US Environmental Protection Agency, updated 2026-06-25. Checked Oct 7, 2026
  • EPA, RRP rule GovernmentRenovation, Repair and Painting Program: Contractors, US Environmental Protection Agency, updated 2026-03-31. Checked Oct 7, 2026
  • IRC 2021, R703.1 CodeInternational Residential Code 2021, R703.1 Exterior covering, general, International Code Council, 2021. Checked Oct 7, 2026
  • NBC 2020, 9.27.5.6 CodeNational Building Code of Canada 2020, 9.27.5.6 Expansion and contraction, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, 9.27.7 CodeNational Building Code of Canada 2020, 9.27.7 Wood Shingles and Shakes, National Research Council Canada, 2020, Vol. 2, pp. 9-190 and 9-191 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 15, 2026
  • James Hardie, HardiePlank (Canada) Manufacturer dataHardiePlank Lap Siding installation instructions, HZ5, Canada, James Hardie Building Products, HS11118 (French edition HS1229), effective September 2019. Checked Oct 7, 2026
  • NBC 2020, 9.27.3.3 CodeNational Building Code of Canada 2020, 9.27.3.3 Required sheathing membrane and installation, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, 9.27.3.4 CodeNational Building Code of Canada 2020, 9.27.3.4 Insulating sheathing in lieu of sheathing membrane, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, 9.27.2.2 CodeNational Building Code of Canada 2020, 9.27.2.2 Minimum protection from precipitation ingress, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, Appendix C, Table C-2 CodeNational Building Code of Canada 2020, Appendix C, Table C-2 Climatic design data, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, 9.27.4.1 CodeNational Building Code of Canada 2020, 9.27.4.1 Required sealants, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, 9.27.3.8 CodeNational Building Code of Canada 2020, 9.27.3.8 Flashing installation, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, 9.27.2.4 CodeNational Building Code of Canada 2020, 9.27.2.4 Protection of cladding from moisture, National Research Council of Canada (CCBFC), 2020 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 7, 2026
  • NBC 2020, 9.19.1.2 CodeNational Building Code of Canada 2020, 9.19.1.2 Vent Requirements (roof spaces), National Research Council Canada, 2020, Vol. 2, p. 9-109 (Quebec: Code de construction, chapitre I, in force 2025-04-17). Checked Oct 15, 2026
  • Sakrete, stone veneer mortar Manufacturer dataSAKRETE stone veneer mortar (Mortier pour placage de pierre), technical data sheet, Sika Canada (SAKRETE), sheet read 2026-10-15 (no date printed). Checked Oct 15, 2026
  • Health Canada, asbestos GovernmentAsbestos and your health, Health Canada, modified 2023-02-10. Checked Oct 7, 2026
  • Health Canada, lead paint GovernmentLead-based paint, Health Canada, modified 2026-10-02. Checked Oct 7, 2026
  • CNESST, asbestos GovernmentAsbestos, CNESST, page consulted 2026-10-07. Checked Oct 7, 2026
  • RBQ, chapter I GovernmentRégie du bâtiment du Québec, Construction Code, Chapter I, Building (NBC 2020 modified for Quebec), Régie du bâtiment du Québec, page consulted 2026-10-08. Checked Oct 8, 2026
  • RBQ, transition to 2027-10-17 GovernmentRégie du bâtiment du Québec, Extension of the transition period in building and electricity: regulations published, Régie du bâtiment du Québec, news of 2026-08-26, in effect 2026-09-10. Checked Oct 8, 2026

Your trade isn't listed? The AI assistant builds your form.

No credit card. Cancel anytime.