For landscapers and their crews

Patios, beds and lawns, measured and calculated on site.

From hardscape to planting and lawn care: MesuPro calculates areas, base and excavation volumes, plants, mulch and labor time while you walk the property.

No credit card. Cancel anytime.

More templates to try: Landscaping: planting Lawn installation: sod and seed Artificial turf installation: survey Bed edging and decorative stone: survey Landscape lighting: survey Lawn care Tree & shrub pruning Irrigation systems Landscaping: general maintenance Yard drainage survey Tree removal and stump grinding survey

Landscaping: a MesuPro sheet with calculated values and totals
Landscaping: the same sheet on a phone
A real MesuPro sheet: the math and the totals happen as you type.

Landscaping: from the yard to the order

Landscaping templates, ready to use

From hardscape to seasonal upkeep, start from the one closest to your jobs.

Hardscaping: patios & walkways⁠

Patios, walkways and walls: material with waste, base stone in tons, polymeric sand, geotextile and excavation.

You get: Total area Material to order Base volume

Landscaping: planting⁠

Beds, hedges and amendments: number of plants, mulch and soil volumes.

You get: Planting area Total number of plants Mulch needed

Lawn installation: sod and seed⁠

A new lawn, zone by zone: sod or seed, sod to order, rolls, pallets, seed, topsoil and fertilizer.

You get: Lawn area Sod to order Seed to buy

Artificial turf installation: survey⁠

Artificial turf, area by area: dig, base per material, roll strips and turf to order, seams, nails and staples, infill and bags.

You get: Net area Soil to dig Base

Bed edging and decorative stone: survey⁠

Bed edging and decorative stone, bed by bed: pieces and stakes, stone volume, fabric, bags or bulk tons.

You get: Pieces Bed area Stone volume

Landscape lighting: survey⁠

Low-voltage landscape lighting: watts and VA per run, fixtures per product, voltage drop and voltage at the last fixture, transformers.

You get: Total watts Total VA

Lawn care⁠

Lawns and edges: areas, condition, frequency and estimated mowing time.

You get: Total area

Tree & shrub pruning⁠

Trees and hedges: dimensions, pruning type, brush volume and labor time.

You get: Area to trim

Irrigation systems⁠

Irrigation zones, pipes and tanks: flows, water use and trench volume.

You get: Irrigated area Zone flow Water per watering

Landscaping: general maintenance⁠

Grounds upkeep: areas, tasks, frequency, time and waste volume.

You get: Maintenance area

Yard drainage survey⁠

French drains and dry wells: trench, stone, geotextile, water to hold, pit volume and footprint, hours to empty.

You get: Water to hold

Tree removal and stump grinding survey⁠

Tree removal and stump grinding, tree by tree: DBH, condition, permit, inches of DBH and stump, volume ground and debris loads.

You get: DBH to fell Stump diameter to grind

What you record on site

See the list (12)
  • Patios, walkways and driveways: length, width, material, base thickness
  • Retaining walls, steps and borders: length, height, thickness, material and the product's blocks per sq ft
  • Excavations: length, width, depth and soil type
  • Planting beds and hedges: area, plant density or spacing
  • Lawns: area, condition and mowing frequency
  • For a new lawn: each zone, sod or seed, the area of one roll and one pallet, the bag rate and the topsoil depth
  • For artificial turf: each area along the rolls, the dig, the base, the roll width, the edges to fasten with your spacings and the maker's infill rate
  • For beds: each run of edging measured along the curves, the piece and its overlap, and each bed to cover with stone with its depth
  • For landscape lighting: each fixture with its watts and VA from the label, each wire run with its tap, gauge, the maker's wire constant and its length, and each transformer as its label prints it
  • For a wet yard: each stretch of french drain (length, trench, stone layer, slope, outlet) and each dry well (area drained, design rain, infiltration test, distance from the house)
  • For a removal: each tree with its species, DBH, height, condition, what is under it, how it comes down, the city permit, the stump to grind and the debris
  • Notes and photos for every area

What MesuPro calculates for you

See the list (11)
  • Paver area, material with 5% waste, compacted base in cubic yards and base stone to order in tons from the density of your quarry, bedding sand, polymeric sand bags, geotextile and edge restraint length
  • Excavation volumes and wall material volumes, and for each wall the face area, cap length and blocks to order, per material
  • The number of plants and the mulch for a 2 in layer
  • For a new lawn: the sod to order with the waste, the rolls and pallets, the seed in pounds, the topsoil in cubic yards and the starter fertilizer
  • For artificial turf: the soil to dig, the base per material with its allowance, the strips with the length and area to order, the seams, the nails and staples, the infill and its bags, per product
  • For beds: the edging pieces and stakes per product, the stone by volume, bags or bulk tons, and the landscape fabric rolls
  • For landscape lighting: the watts and VA per wire run and for the system, the fixtures per product, and each run's voltage drop and the voltage at its last fixture by the maker's formula
  • Mowing, trimming and maintenance time, from your own rates
  • Irrigation zone flow and water use per day
  • For a wet yard: the drain's excavation, stone and geotextile, its drop to the outlet, the water a dry well must hold, the pit over the stone's voids and the hours the soil takes to empty it
  • For a removal: the inches of DBH and of stump to grind, the stump volume ground and the debris loads at your truck's capacity, never a price

The report, as PDF or Excel

Export a PDF with your photos for your client, or an Excel file with the areas, volumes and times for your quote.

Landscaping: a page of the PDF report exported from MesuPro, with the site photos and the measurement table
The site photos, then the measurements.
Landscaping: first page of the PDF report exported from MesuPro
Page 1: the summary and the totals.

FAQ

Can it estimate my time?

Yes. Enter your own rate (for example minutes of mowing per 1,000 sq ft) and MesuPro calculates the time for each area.

Metric or imperial?

Both. A new sheet starts in your organization's system, and a switch on the sheet goes from one to the other, converting the measurements.

What about tree removal?

Use the tree removal survey. In our Ann Arbor example, a 24 in DBH silver maple over the garage and four dead 10 in ash trees along the fence come to 64 in of DBH to fell and 78 in of stumps to grind. With 9 cu yd of debris for the maple and 2.5 cu yd per ash, a 12 cu yd truck makes 2 trips. The sheet never prices: it adds up the inches, and your own rate does the rest.

What about a yard that stays wet?

Use the yard drainage survey. In our Ithaca example, the back corner downspout drains 600 sq ft of roof: for a 1-inch rain the dry well holds 50 cu ft of water, 125 cu ft of clean stone at 40% voids, about 42 sq ft at 3 ft deep. The soil, tested at 1 in/h, empties it in 14 hours, under the 48 hours the Quebec stormwater guide designs for.

What about artificial turf?

Use the artificial turf survey. In our Plano, TX example, a 30 x 24 ft front lawn less a 20 sq ft bed and a 12 x 15 ft dog run come to 880 sq ft net. In 15 ft rolls with 4 in to trim, the lawn takes 2 strips of 30 ft 4 in and the run one: 61 ft of turf for the lawn and 13 ft for the run, with one 30 ft seam. 4 in of base with a 15% allowance comes to 13 cu yd; infill at 2.5 lb per sq ft on the lawn and 2 on the run (the Envirofill chart) is 2,110 lb, 43 bags of 50 lb. The makers differ on the base, the nail spacing and the infill: the sheet quotes each, and you type your product's figures.

What about bed edging and decorative stone?

Use the bed edging and decorative stone survey. In our Hartford, CT example, 87 ft of aluminum edging in 16 ft pieces with 2 in of overlap (Permaloc) takes 6 pieces and 28 stakes at 5 a piece. The 20 x 6 ft front bed, less 8 sq ft of shrubs, gets 2 in of river stone: 38 bags of 0.5 cu ft; around the maple, 40 sq ft of bulk decorative stone comes to 1 US ton at the supplier's density, and 2 rolls of 150 sq ft fabric cover it all with 10% for the overlaps. Sable Marco gives a 1 to 2 in layer; the sheet fills in nothing.

What about landscape lighting?

Use the landscape lighting survey. In our Knoxville, TN example, eight 4 W path lights along the walk sit on a 60 ft run of 16 gauge wire, and five 7 W uplights, three on the maple and two on the front wall, on a 110 ft run of 12 gauge, both on the 12 V tap of a 300 W transformer. The sheet adds up 32 W on the walk and 35 W on the front, 85 VA for the system. With eVolt's wire constants (2,200 for 16 gauge, 7,490 for 12 gauge), the walk drops 0.87 V and its last fixture gets 11.13 V; the front drops 0.51 V and gets 11.49 V. The sheet compares nothing and sizes nothing: the 120 V side stays an electrician's work.

What about maintenance contracts?

The lawn care and general maintenance templates record frequency, difficulty and time per visit, area by area.

Several patios or zones on one job?

Yes. A patio, walkway or driveway is its own part of the survey, with its pavers, walls, steps and dig as tabs: "Add a patio", "Add a walkway" and "Add a driveway" add another. In the irrigation template, "Add a zone" adds a valve zone with its heads and pipe.

Try MesuPro on your next job.

Start your 14-day free trial

No credit card. Cancel anytime.

Did this page help you?