Sound insulation: survey
Sound insulation work: walls and ceilings by location, treatment, sheets, damping, resilient channel, sealant and openings.
No credit card. Cancel anytime.
Feet and inches or metric: your choice. One switch on the sheet converts every measurement.

What you measure
The template's tables and their columns, as the app shows them. Calculated columns fill in as you type.
Walls and ceilings
- Surface
- WhereChoices: Wall shared with a neighbor Wall between two rooms Ceiling under a unit or room Floor over a unit or room Wall to a stairwell or mechanical room
- Length
- Height or width
- Area calculated
- FramingChoices: Wood studs Steel studs Wood joists Concrete or block Not seen
- CavityChoices: Filled with insulation Partly filled Empty Not seen
- Noise heardChoices: Voices TV or music Footsteps and impacts Plumbing Mechanical equipment Traffic outside
- Treatment plannedChoices: Insulation in the cavity Resilient channel and new board Second layer with damping Sound clips and furring channel New wall in front, not touching To decide
- New layers
- Sheet area
- Sheets calculated
- Damping tubes per sheet
- Damping tubes calculated
- Channel spacing
- Resilient channel calculated
- Perimeter to seal calculated
- STC of the chosen assembly
- Notes
Openings and sound paths
- OpeningChoices: Electrical box Duct or register Door Window Pipe Recessed light Gap at floor or ceiling Shared cavity or soffit Other
- Where
- Openings counted
- Opening treatmentChoices: Acoustic sealant Putty pad Gasket and door sweep Lined or rerouted duct Moved or offset To decide
- Notes
About this template
Walls, ceilings and floors before sound insulation work: area, framing, noise heard, treatment, board, damping, channel, sealant, and the openings.
Guide and sources
The visit before sound insulation work on walls, ceilings and floors, on one sheet. The surfaces: one row per surface, where it sits (the area adds up by where), its framing and cavity, the noise heard and the treatment planned; from the figures you type, the sheets of new board, the damping tubes, the length of resilient channel and the perimeter to seal; the STC of the chosen assembly as its test listing gives it.
The openings: one row per kind of opening or path the sound takes (electrical boxes, ducts, doors, pipes, recessed lights, gaps, shared cavities), counted by kind, with the treatment planned. The drywall survey keeps the board, the finish and the repairs.
The hints cite without applying: NBC 2020 Section 9.11 and its Note, the Quebec edition included, and IBC 2021 Section 1206 for the separations between dwelling units; ClarkDietrich on resilient channel spacing and screws; Green Glue on its damping compound. No rating is computed or judged, nothing is pre-filled, and no result is promised. No price: the sheet is the measure.
Sources
- IBC 2021, 1206 Code
- Green Glue, damping compound Manufacturer data
- ClarkDietrich, resilient channel Manufacturer data
- NBC 2020, 9.11 Code
More templates: Drywall
Drywall survey
Walls and ceilings room by room, sheets, trim, compound, tape and screws, GA-214 finish levels, repairs and textured ceilings.
You get: Board area Sheets Trim pieces
Suspended ceiling survey
Suspended ceilings room by room: tees, wall angle, hanger wires, 2 x 4 or 2 x 2 panels and the border panels.
You get: Ceiling area Wall angle run Wall angle pieces
Your trade isn't listed? The AI assistant builds your form.
Start your 14-day free trialNo credit card. Cancel anytime.