For deck builders and their crews
Every board, every joist and every post counted for your bid.
Walk the deck on your phone: one row per surface, beam line, guard run and stair. MesuPro counts the boards, joists, hangers, fasteners, posts, concrete bags, balusters and steps from your own values.
No credit card. Cancel anytime.
More templates to try: Pergola: survey Aluminum and glass railings: survey


The deck, pergola and railing templates
Feet, inches, square feet or metric: your choice.
Deck survey
Surfaces and decking, joists and fasteners, hidden clips, beams and concrete, guards, stairs with stringers and risers, fascia.
You get: Deck area Board rows Decking length
Pergola: survey
A pergola: posts from their spacing, beam boards, rafters and purlins with their lengths, footing concrete and bags.
You get: Posts Beam boards Rafters
Aluminum and glass railings: survey
Railing runs with their sections and posts, the mounting and the structure seen, stair sections on their slope, glass panels, gates.
You get: Sections Posts Length along the slope
What you record on site
See the list (10)
- Each surface: its length, projection, height and attachment (ledger or freestanding)
- The decking: board width, gap, the length you buy and your waste
- Joists: size, spacing, hangers and fasteners per crossing
- Beams, posts and footings: spacing, diameter and depth
- Guards: type, length, height, posts and balusters
- Stairs: total rise, tread run, width and stringers, the boards per tread and per riser, the screws at each stringer
- Composite: the area one box of hidden fasteners covers, the fascia and its screw rows
- For a pergola: its length and width, how it is mounted, the beam lines and the post, rafter and purlin spacings from the plans, and its footings
- For an aluminum or glass railing: each run, its height above the ground, how the posts are fixed and the structure seen, the stairs, the glass panels and the gates
- For board replacement: each group of boards, the decking and board size, the boards and their length, the fastening, the joists under them as seen, the match and the cause
What MesuPro calculates for you
See the list (10)
- The area by decking material
- Board rows and decking length, then the boards to buy, rounded up to the board
- Joists, hangers and decking fasteners
- Posts, concrete per footing and the bags to buy
- Guard posts, balusters, steps and stringers
- The total run, the stringer length along the slope, the tread and riser boards, the stair screws
- The hidden fastener boxes, the fascia boards and their screws, rounded up once
- For a pergola: the posts, beam boards, rafters and purlins with their lengths, and the concrete bags for the footings
- For a railing: the sections and posts from the chosen product's spacing, the stairs' slope and length, the glass area
- For board replacement: the boards and the length to replace by material
No span, spacing or waste comes filled in: they are yours. The span tables and the guard and stair rules are cited in the template's help; also check your city's rules.
Deck calculator: free, no account
The report, as PDF or Excel
Export the survey to PDF with your photos for the client, or to Excel to bring the quantities into your quote.

FAQ
Does the template pick the joist size?
No: you choose the size and the spacing. The help cites the span tables to check. The template counts the joists, hangers and fasteners.
How many boards to buy?
From your board width, gap, waste and the length you buy. The total is rounded up to the board.
What about composite stairs?
The sheet gives the total run, the stringer length and the boards. In our Charlotte example, a 36 in rise at 7 3/4 in at most comes to 5 risers and 4 treads of 11 1/4 in, a 45 in total run, 4.8 ft stringers along the slope, 28 ft of tread boards and 130 screws over 5 stringers. For composite treads each maker sets the stringer spacing: Fiberon 12 in, Deckorators 9 in, TimberTech 9 or 10 in by collection; the help cites them.
What about guards?
A table of their own for the length, height, posts and balusters. The help cites the required heights and openings.
What about a pergola?
Use the pergola survey. In our Madison, WI example, a 16 x 12 ft pergola over the deck, with two beam lines and posts at 14 ft (Heartland's example), takes 6 posts, 4 beam boards of 18 ft, 14 rafters of 14 ft at 16 in and 15 purlins at 12 in; its 6 footings of 10 by 36 in take 20 bags of 30 kg (Quikrete). The patio pergola, anchored to the slab, adds 4 posts, 9 rafters and 10 purlins. The sizes and spacings come from the plans or the kit: the sheet sizes nothing. Check the city for the permit.
What about an aluminum or glass railing to replace?
Use the railing survey: one row per run, with its length, the height above the ground and the chosen product's post spacing. In our Tacoma example, a second-storey balcony 11 ft 6 in above the yard has a 14 ft front and two 5 ft sides fixed to the wall: at 68 3/4 in at most between the posts, the sheet counts 5 sections and 4 posts. The glass panels make 61 sq ft, and the outside stair, 138 in of rise over 165 in of run, a slope of 0.84 and 17.93 ft along the slope.
What height and what glass for a railing?
The sheet records the height and the glass without judging them: it cites the IRC 2021. A guard where the walking surface is more than 30 in above the grade (R312.1.1), at least 36 in high (R312.1.2), and glass in guards is a hazardous location that takes safety glazing (R308.4.4); check what your state or city requires. In the example, the railing is 42 in high.
What about a few boards to replace?
Use the Board replacement part of the deck survey: one row per group of boards, the decking, the board size, the boards and their length, how they are fastened, the joists under them as seen. In our Charlotte example, 2 composite boards of 16 ft make 32 ft to replace, on hidden clips; Trex's steps for a clipped board are in the hint. The sheet asks whether new boards will match and never promises it.
Did this page help you?