How to measure a patio for pavers
Measure each area, choose the base thickness, then work out the pavers, base stone, sand and polymeric sand to order. A worked example and a free calculator are at the end.
What to bring
- A tape measure or a measuring wheel
- Stakes and string to mark the areas
- Something to note each area: paper, or a MesuPro sheet on your phone
Step by step
Split the layout into rectangles
A patio, a walkway, a landing: each rectangle on its own line. A curved edge is measured at its longest and widest points.
Measure length and width
In feet (or meters), along the edges of the area to pave.
Choose the base thickness and extension
The base depth depends on the soil and the use: about 6 in for a patio on well-drained soil, 8 to 12 in for a driveway, more on clay or in freeze-thaw climates (ICPI, manufacturers' guides). The base extends past the pavers by about its own thickness on each side: count that extension in the stone.
Read the results
Pavers: the area plus the waste of the laying pattern (3 to 5% straight, 10 to 15% herringbone). Base stone: the area grown by the extension x the thickness, then x the density your quarry gives for the weight to order (it varies with the source and the moisture), shown in US tons. Bedding sand: the area x the bed thickness, 1 in (25 mm) in the ICPI guide. Polymeric sand: the area divided by the coverage printed on your bag (about 60 to 120 sq ft for narrow joints), rounded up. Geotextile: under the base and up its sides, plus your overlap allowance (ICPI overlaps the rolls by at least 12 in). Edging: the perimeter.
The calculation
The template's formulas: pavers = area x (1 + waste / 100). Base stone = (length and width plus the extension on each side) x thickness; to order, x the density your quarry gives, shown in US tons (rounded up to the whole metric ton in metric): no density, no tonnage. Bedding sand = area x bed thickness (1 in, 25 mm, in ICPI's guide). Polymeric sand = area / coverage per bag, rounded up. Geotextile = under the base and up its sides, x (1 + your overlap allowance / 100); empty counts none (ICPI overlaps the rolls by at least 12 in). Edge restraint = the perimeter of each area. This page starts with typical values and their sources; the template itself starts with empty fields you fill in for the job.
Worked example
A 20 x 12 ft patio and a 30 x 4 ft walkway on a 6 in base that extends 6 in past each edge, a 1 in bedding layer, 5% waste and a polymeric sand covering 75 sq ft per bag: 360 sq ft, 378 sq ft of pavers to order, 7.93 cu yd of base stone (14.66 US tons with the density your quarry gives, 137 lb/cu ft in this example), 1.11 cu yd of bedding sand, 5 bags of polymeric sand, 550 sq ft of geotextile (with a 10% overlap allowance in this example) and 132 ft of edging.
Common mistakes
- Forgetting the edging and the geotextile in the order.
- Mixing up the compacted volume and the weight to order: suppliers sell stone by the ton or by the yard, so ask which.
- Measuring a curved area too tight: round up.
- Mixing feet and inches: 6 in is 0.5 ft.
Landscaping: from the yard to the order
The whole job in MesuPro
Hardscaping: patios & walkways
Patios, walkways and walls: material with waste, base stone in tons, polymeric sand, geotextile and excavation.
You get: Total area Material to order Base volume
Your trade isn't listed? The AI assistant builds your form.
Start your 14-day free trialNo credit card. Cancel anytime.