Free deck calculator: boards, joists, footings and balusters

Get the boards, joists, fasteners, posts, footing concrete and balusters for a deck in seconds, free and without an account. One row per deck surface: its length along the house and its projection. Enter your boards, spacing, footings and guard: the calculation counts the rest. The span tables and the rules sit beside it, as references.

How to fill it in

One row per deck surface: its length along the house and its projection. Enter your boards, spacing, footings and guard: the calculation counts the rest. The span tables and the rules sit beside it, as references.

Units
Feet and inches

Surface 1

ft
ft
in
in
%
ft
in
ft
in
in
cu ft
ft
in
in

Hangers, beams, clips and fascia (optional)

Leave empty what the job does not use. Joist and beam sizes come from the span tables, never from here.

sq ft
ft
ft
in

Result

Fill in the fields to see the result.

A quick estimate for a single-level deck: joist and beam sizes are picked from the span tables. The template handles the whole job: beam lines of different lengths, stairs, hangers, the ledger and the old deck.

The whole job, not only this calculation

For deck builders and their crews, the template does what this page cannot: the whole job on one sheet, every measurement on its own line, saved in the client's project with a PDF or Excel report.

Joist spans: IRC Table R507.6 (reference)

Maximum deck joist spans in the US at a 40 psf live load, in feet-inches, by joist spacing. Canada has no deck-specific table: the NBC points to Span Tables 9.23.4.2 (floor joists in residential use), and a deck serving one dwelling carries the roof snow load or 1.9 kPa, whichever is greater (9.4.2.3).

Species and size12 in16 in24 in
Southern pine 2x813-111-109-8
Southern pine 2x1016-214-011-5
Douglas fir-larch, hem-fir or spruce-pine-fir 2x812-611-19-1
Douglas fir-larch, hem-fir or spruce-pine-fir 2x1015-813-711-1

Sources: IRC 2021, R507; NBC 2020, Part 9

AWC DCA 6 (a separate reference)

The American Wood Council's prescriptive guide, based on the 2015 IRC. It has its own tables, which sometimes differ from the IRC: where they differ, the IRC applies.

DCA 6
Posts6x6 or larger
FootingsAt least 12 in below undisturbed ground or below the frost line, whichever is deeper; within 5 ft of the house, at the house footing level
StringersAt least 2x12; at least three cut stringers; at most 18 in on center on stairs wider than 36 in

Source: AWC DCA 6

Footing depth (reference)

As read. Also check the frost depth your city recognizes.

Rule as read
IRC 2021, R507.3At least 12 in below undisturbed ground, and below the frost line when the deck is attached to a frost-protected structure; no footings for a freestanding deck of 200 sq ft or less, 20 in or less above grade, on precast pier blocks without beams or posts
NBC 2020, Table 9.12.2.2By soil and drainage: 1.2 m (4 ft), or below the frost depth
NBC 2020, 9.12.2.2.(7)Not required for a deck of 1 storey or less, 55 m² (592 sq ft) or less, joists 600 mm (24 in) or less above the ground, no roof and not attached

Sources: IRC 2021, R507; NBC 2020, Part 9

Guards (reference)

As read, in the US and in Canada.

IRC 2021 (US)NBC 2020 (Canada)
RequiredMore than 30 in up within 36 in of the edgeA drop of more than 600 mm within 1.2 m of the edge
Height36 in; 34 in along stairs1 070 mm; 900 mm for an exterior guard serving one dwelling where the deck is 1 800 mm or less above the ground
OpeningsA 4 in sphere does not passA 100 mm sphere does not pass
ClimbingNo such rule readThe rule against climbable members applies only to guards more than 4.2 m up

Sources: IRC 2021, R312.1 and R311.7; NBC 2020, Part 9; NBC 2020, 9.8

Composite boards: the makers (reference)

What the installation guides say, cited as a guide: your spacing, gap and fasteners stay yours.

TrexTimberTech
Joist spacing16 in for 1x6 boards (US chart); 4 in less at 45 degrees16 in at most; 12 in for angled boards
Gap between boards3/16 in (5 mm)1/8 to 3/16 in
FastenersTwo screws per joistPer the fastening system
Lengths12, 16 and 20 ftPer the product

Sources: Trex 2026 guide; TimberTech composite guide

Wood boards (reference)

For a wood deck, as read.

Rule as read
Joist spacingIRC R507.7, 5/4 boards: 12 in on a single span, 16 in on several, 8 or 12 in diagonal
Gap between boardsAbout 1/8 in on a finished deck; damp boards butted, they shrink as they dry (Wood Preservation Canada)
FastenersAt least two nails or screws at each joist (IRC); 2 screws at each joist and 2 at each end (Wood Preservation Canada)

Sources: IRC 2021, R507; Wood Preservation Canada, building tips

How it is calculated

For each surface: board rows = projection / (width + gap), rounded up; decking length = rows x length x (1 + waste); boards = decking length / length bought, rounded up at the total. Joists = length / spacing, rounded up, + 1; joist length = joists x projection; fasteners = rows x joists x fasteners per crossing. Posts = beam lines x (length / spacing, rounded up, + 1); concrete per footing = PI x diameter² / 4 x depth; bags = posts x concrete / bag yield, rounded up at the total. Balusters = guard length / (width + gap), rounded up. Joist hangers = joists x hangers per joist. Beam lumber = beam lines x deck length x plies. Hidden fastener boxes = deck area / the area a box covers, rounded up at the total. Fascia boards = fascia length / board length, rounded up; fascia screws = (fascia length / row spacing, rounded up, + 1) x screws per row. No span or load is checked, and nothing comes filled in: these are your values.

The whole job in MesuPro

For deck builders and their crews: every employee measures with the same form, the math is done as they type, and the office finds the sheet and its PDF or Excel report. 14-day free trial, no credit card.

Deck survey⁠

Surfaces and decking, joists and fasteners, hidden clips, beams and concrete, guards, stairs with stringers and risers, fascia.

You get: Deck area Board rows Decking length

Your trade isn't listed? The AI assistant builds your form.

Start your 14-day free trial

No credit card. Cancel anytime.

Did this page help you?

Feedback on this calculator

A result that looks wrong, a missing case, an idea? Tell us.

Please don't put personal details in this box.