Siding calculator: wall area, squares and pieces

One row per wall: its length, its height, the gable rise if it has one, and the openings you deduct. Enter your waste and the pieces per square read from the maker's chart: the calculation gives the squares and the pieces.

Units

Wall 1

ft
ft
ft
sq ft
%

Result

Fill in the fields to see the result.

A quick estimate, for one product: the pieces of two products never add up. The template handles the whole job: openings and their trim, corners, starter strip, house wrap, furring, soffits and totals by elevation.

Pieces per square: the makers' charts (reference)

The pieces per square depend on the piece length and its exposure: read your product's row. These charts include no waste. HardiePlank's Canadian chart also gives the planks per m².

ChartPiece and exposurePer square (100 sq ft)
HardiePlank (US)12 ft planks, 6 in exposure17
LP SmartSide12 ft lap, 6-7/8 in reveal15
LP SmartSide16 ft lap, 4-7/8 in reveal16
LP SmartSide16 ft lap, 5-7/8 in reveal13
LP SmartSide16 ft lap, 6-7/8 in reveal11
LP SmartSide16 ft lap, 10-7/8 in reveal7

Sources: James Hardie, HardiePlank (US); LP SmartSide, coverage chart; James Hardie, HardiePlank (Canada)

Waste and openings: the VSI manual (reference)

The Vinyl Siding Institute's installation manual, cited as a guide: your waste and your deductions stay yours.

VSI manual
WasteAdd 10 percent to all material estimates
OpeningsWindows and doors are usually not deducted
Square100 sq ft

Source: VSI installation manual

Rainscreen: when Canada's NBC asks for a capillary break (reference)

In the US, the IRC asks for a way for water that gets past the siding to drain out. In Canada, NBC 2020 (9.27.2.2) asks for a capillary break, for example a drained and vented air space at least 9.5 mm deep over the whole wall, or drainage material at least 10 mm thick: below 3400 degree-days where the moisture index is over 0.90, at 3400 degree-days or more where it is over 1.00. Examples from its Table C-2:

PlaceDegree-days and indexCapillary break
Montreal (City Hall)4200 and 0.93Not required
Quebec City5080 and 1.0Not required
Sainte-FoyIndex 1.1Required
PercéIndex 1.2Required

Sources: IRC 2021, R703.1; NBC 2020, 9.27.2.2; NBC 2020, Appendix C, Table C-2

Before you tear off or cover: the cautions (reference)

What the sources say, as read.

Caution
Lead paintIn homes built before 1978, work that disturbs paint is done by certified firms and renovators; exterior jobs disturbing 20 sq ft or less are exempt, demolition of painted surfaces never is
AsbestosIt usually cannot be identified by sight: do not saw, sand, scrape or drill old siding; a trained, accredited professional takes the samples
ClearancesWood siding within 6 in of the ground, or 2 in of slabs and steps, must be naturally durable or treated

Sources: EPA, RRP rule; EPA, asbestos; IRC 2021, R317.1

How it is calculated

Gross area = length x height + length x gable rise / 2 (the gable triangle). Net area = gross - openings deducted. Squares = net area x (1 + waste) / 100 sq ft. Pieces = squares x pieces per square, rounded up to the piece on the total. No waste, deduction or piece count comes filled in: they are yours and the chart's.

The whole job in MesuPro

Siding survey

Four elevations with walls and gables, openings, trim and soffits: squares and pieces per product, housewrap, furring and old siding hazards.

Feet and inches by default

Start with this template Try it, no account

Your trade isn't listed? The AI assistant builds your form.

Start your 14-day free trial

No credit card. Cancel anytime.