Free fence calculator: posts, sections, pickets and concrete
Get the posts, sections, rails, pickets and concrete bags for a fence in seconds, free and without an account. One row per fence run: its length. Enter your post spacing, rails, pickets, hole size and the concrete printed on the bag: the calculation counts the rest. One fence style at a time.
The whole job, not only this calculation
For fence contractors and their crews, the template does what this page cannot: the whole job on one sheet, every measurement on its own line, saved in the client's project with a PDF or Excel report.
- Fence survey: Runs by style, posts, sections, rails and pickets, gates, concrete bags, the old fence and a chain link take-off.
- MesuPro for fence contractors: every template of the trade, the demo and the report
Concrete per bag and hole size (reference)
The yield printed on a bag of fast-setting concrete mix, cited as a guide: enter the one on your bag. The same maker digs a hole about 3 times the post width, 1/3 of the post length deep, and stops the concrete 3 to 4 in below grade.
| Bag | cu ft | Liters |
|---|---|---|
| 50 lb | 0.375 | 10.6 |
| 60 lb | 0.45 | 12.7 |
| 25 kg | 0.41 | 11.6 |
| 30 kg | 0.5 | 14 |
Source: Quikrete 1004 data sheet
Pool enclosure: the rules as read (reference)
The pool enclosure rules, as read in the texts. Many places adopt them with local changes: check the version your city enforces and its fence bylaw.
| Rule | US (ISPSC 2024) | Quebec |
|---|---|---|
| Height | At least 48 in, measured on the outside | At least 1.2 m |
| Openings | Stop a 4 in sphere | Stop a 10 cm sphere; nothing that helps climbing |
| Chain link mesh | 1 3/4 in or less | 30 mm or less |
| Gap under the fence | At most 2 in over grass or gravel, 4 in over a solid surface | No rule in this text |
| Gate | Opens outward, closes and latches on its own; latch release at 54 in or more, or on the pool side | A passive device closes and locks it on its own, inside at the top of the gate or outside at 1.5 m or more |
Sources: ISPSC 2024, 305; Quebec residential pool safety regulation (S-3.1.02, r. 1)
How it is calculated
For each run: sections = length / spacing, rounded up, and posts = sections + 1 (each run has its two ends). Rails = sections x rails per section. Pickets = length / (picket width + gap), rounded up. Concrete per hole = (pi x diameter² / 4 - post width²) x concrete depth: a square post in a round hole. Bags = posts x concrete per hole / concrete per bag, rounded up on the total. No spacing, hole size or bag yield comes filled in: they are yours and the bag's.
The whole job in MesuPro
For fence contractors and their crews: every employee measures with the same form, the math is done as they type, and the office finds the sheet and its PDF or Excel report. 14-day free trial, no credit card.
Fence survey
Runs by style, posts, sections, rails and pickets, gates, concrete bags, the old fence and a chain link take-off.
You get: Posts Sections Rails
Your trade isn't listed? The AI assistant builds your form.
Start your 14-day free trialNo credit card. Cancel anytime.
Did this page help you?